Cleaning of one of the largest pump stations in Brisbane, handling all waste from the S1 trunk main.
As part of rehabilitation works on upstream assets TDG was tasked with cleaning out debris from a 1500mm to allow relining and replacement of sewer door.
TDG’s crew were able to complete all cleaning works in one night including setting up and decommissioning of all hoses, remote jetting reel etc.
Mechanical means was used to assist in the lowering of vacuum pipe into the wet well drastically reducing the chance of manual handling injuries.
Following the success of the noise cancelling headphone TDG is undertaking a feasibility study to assets the validity of equipping all cleaning crews with the technology.