TDG was tasked by the client to conduct comprehensive data collection within the project’s catchment area to evaluate network conditions and renewal needs. This involved employing various techniques, including CCTV inspections, laser profiling, and GPS surveying.
This scope encompassed:
The outcome Essential data gathered facilitated comprehensive design collaboration with Mott MacDonald, streamlining the construction and renewal method selection process and minimizing alterations during execution. Early engagement and input from TDG and Mott MacDonald in the design phase ensured the feasibility of proposed designs, providing cost-effective solutions and maximizing investment value.