A tidal channel in Sydney required the removal of asbestos-contaminated sediment to restore environmental safety and site integrity. The site presented complex conditions including limited access, tidal fluctuations, and a 1.4km haul route from the entry point. TDG Environmental was engaged by the client to deliver a compliant and efficient solution for safe waste removal, stockpile management, and site rehabilitation within a restricted tidal environment.
Â
Services Provided
Â
TDG Environmental successfully removed 905 tonnes of contaminated sediment, achieving full site remediation and clearance certification. The project was completed without safety incidents, flooding, or environmental breaches. Through proactive planning, equipment innovation, and rigorous compliance measures, TDG delivered a safe and sustainable remediation outcome that restored the site’s environmental condition within tight logistical and tidal constraints.