Sewer System Blockage Clearance in VIC

Home / Case Studies / Sewer System Blockage Clearance in VIC

Scope

A severe sewer blockage obstructed 99% of a 1075mm diameter pipe located 30 metres underground, requiring urgent and complex intervention over a 2.5-week period.

 

Services Provided

  • Rapid Response: We mobilised 3 combo units and a CCTV van within an hour of receiving the call.
  • CCTV Inspections: Utilised advanced CCTV technology to accurately assess the blockage.
  • High-Pressure Water Jetting (HPWJ): Employed to break up and clear the obstruction.
  • Confined Space Entry: Implemented deep man entry protocols with all necessary safety equipment to access the blocked section.
  • Manual Handling and Labour: Our operators worked tirelessly around the clock to address the issue.

Challenges

  • Complex Blockage: The obstruction was nearly 1 metre in diameter and extended 10-15 metres, consisting of food scraps, medical waste, rags, and fats.
  • Location: The pipe’s depth and length (30 metres underground and 90 metres along the O-void) made access and clearance challenging.
  • Dynamic Work Environment: Required constant updates and adjustments to equipment, operator numbers, and work schedules to adapt to evolving conditions.
  • Safety Protocols: Collaborated closely with the Utilities Client’s Health and Safety team to maintain the highest safety standards.

The outcome

The successful clearance of the blockage ensured the continued functionality of the sewer system, preventing potential overflows and maintaining sanitation standards for the community. This project highlighted our team’s capability to tackle extreme challenges through effective coordination, advanced technology, and relentless effort.

Industry

Utilities

Location

VIC

Project Highlights

  • Collaboration and Coordination: Worked in partnership with the Utilities Client, Interflow contractors, and support teams from various locations to effectively manage the blockage.
  • Advanced Technology: Employed robotics from Queensland and specialised equipment from Truganina and Dandenong to enhance operational efficiency.
  • Team Effort: Acknowledged the dedication and hard work of the Geelong Depot team, Operations Scheduler, Ops Supervisor, Project Managers, and all operators involved.

Get in touch

For a comprehensive quote on any of our services, or general enquiries, please fill out the form below or contact us.







    Apply for a career at TDG New Zealand

    Error: Contact form not found.

    Apply for a career at TDG Australia

    Error: Contact form not found.