A severe sewer blockage obstructed 99% of a 1075mm diameter pipe located 30 metres underground, requiring urgent and complex intervention over a 2.5-week period.
Services Provided
The successful clearance of the blockage ensured the continued functionality of the sewer system, preventing potential overflows and maintaining sanitation standards for the community. This project highlighted our team’s capability to tackle extreme challenges through effective coordination, advanced technology, and relentless effort.